The capacity requirement is set in 100 low-reserve hours; how many MW to cover depends on how demand responds to heat

1 day ago
11 min read

Capital Projects · S&OP · Power, Energy & Environmental Transition · Mexico

In Mexico, generators receive remuneration for their accredited capacity, determined from their availability during the year's 100 most critical hours: those with the lowest reserve, meaning the smallest margin of available capacity above demand [V]. Suppliers, such as CFE Suministrador de Servicios Básicos, and large consumers purchasing directly in the market must cover an annual capacity requirement. This requirement is calculated from their load's demand during those hours, plus the minimum planning reserve [V].

Critical hours in Mexico's National Interconnected System (SIN) have shifted almost entirely from the afternoon to the evening and night [V]. In 2018, 72 of the 100 occurred between 12:00 and 19:00. In 2025, 95 occurred from 19:00 onward. One plausible explanation is the growth of solar generation, which increases the system's reserve margin during the day and contributes less as evening approaches [H]. Its share of generation across Mexico's National Electric System rose from 0.7% in 2018 to 5.4% in 2025 [D]. In Baja California, critical hours remain concentrated in the afternoon [V].

Heat puts additional pressure on reserve margins.  InsightIA's analysis for 2018–2025 estimates that, for each additional degree Celsius of maximum temperature above 26.5 °C, SIN demand between 19:00 and 23:00 increases by approximately 770 MW, or about 2% of average demand during those hours. The 95% confidence interval is 716 to 823 MW per degree [D]. Air conditioning may explain part of this association, although the model does not distinguish electricity end uses [H]. In hotter years and regions, having capacity available during those hours could become more economically valuable [H].

Between 2021 and 2024, available generation in the SIN during critical hours grew far less than demand [D]. Average demand during those hours increased by 7,944 MW, while available generation increased by 344 MW. In 2025, available generation increased by 2,790 MW and reserves recovered. The comparison describes the evolution of each year's critical hours, which are not necessarily the same hours.

These findings affect two business decisions: how much capacity a supplier should contract and which hours a generation or storage project should be designed to serve. InsightIA proposes explicitly incorporating temperature, hourly demand profiles and available generation into both decisions.

0 · Structure of this note

Section 1 explains which hours set capacity in Mexico and when they fall. Section 2 measures how much demand rises with heat; section 3, what happened to available generation. Section 4 sets the global frame. Section 5 compares the rule in the 7 countries. Section 6 translates everything into the decisions of whoever supplies and whoever builds. Sections 7 and 8 gather testable hypotheses and questions. Verified facts, derived calculations, estimates and hypotheses are distinguished throughout.

1 · The requirement is set at night; reserve, not heat alone, decides the month

Each load-serving entity, such as a supplier, must acquire its Annual Capacity Requirement [V].  The requirement equals the capacity its load demanded in the critical hours, plus the minimum planning reserve. It is set by the Capacity Balance Market Manual, which governs Mexico's annual capacity market. Separate from it is the Contractual Capacity Requirement: the capacity the supplier must have contracted ahead [V]. The first is measured after the year; the second is committed before it.

The critical hours are the 100 hours with the lowest generation reserve in each capacity zone [V].  They have been defined this way since 2018; in 2016 and 2017 they were the 100 hours of highest demand. Each hour's reserve is available generation minus demand. The requirement is therefore set in the hour when the system is tightest, which is not always the hour of highest demand.

In the national interconnected system, those hours moved to the night [V].  In 2018, 26 of the 100 fell from 19:00 onward. In 2025 there were 95. The change is not linear: 93 in 2021, 87 in 2023, 89 in 2024.

Figure 1 · In the national system, critical hours from 19:00 onward rose from 26 to 95 of 100; in Baja California they remain in the afternoon

The month changes more than the hour [V].  In 2022, 2024 and 2025, the critical hours fell between April and June. In 2020 they fell mostly in October; in 2021, in August and October; in 2023, in September. Spring heat and the generation available in each year may explain part of these shifts. The analysis does not yet distinguish the contribution of each factor [H].

Baja California is a different case within Mexico [V].  Its critical hours fall in the afternoon, between July and September. From 2018 to 2025, only 9 to 32 per year fell from 19:00 onward. From 2020 to 2024, the reserve was negative in all of its critical hours.

2 · In those hours, demand rises with temperature

For each degree of maximum temperature above 26.5 °C, national-system demand from 19:00 to 23:00 rises by 716 to 823 MW, with 95% confidence [D].  That is 2.0% of average demand in those hours per degree. It is the interval of an association estimated for 19:00–23:00 on the days in the sample, not a measurement of the 100 critical hours.

The slope is estimated from temperature variation within each month and year [D].  The model nets out season, day of the week, holidays, Holy Week and annual growth. Below 26.5 °C, demand rises 109 MW per degree; above that threshold, 770. The threshold is the best fit between 18 and 36 °C, and the confidence interval uses standard errors robust to autocorrelation of up to 7 days. The calculation uses 2,638 of the 2,922 days in 2018–2025. It excludes March 23 to December 31, 2020, because of the pandemic. The result is an association: air conditioning is the likely explanation, but the model does not separate electricity uses [H].

The slope remains stable when each year is excluded from the estimation [D].  It was estimated 8 times, searching for the threshold again without the excluded year: 26.5 °C in 7 cases and 27.0 °C in 1. The slope ranged from 726 to 790 MW per degree. To assess predictive performance, the excluded year's level was calibrated using January and February, and demand for subsequent days was estimated using their observed temperatures. The daily mean absolute percentage error was 2.8%.

The 7 regional control centers of the national system, each estimated with its own temperature, add up to 769 MW per degree [D].  The Northeast weighs most in MW; the Peninsular and Northwest regions, in proportion to their demand. Baja California, outside the national system, rises 71 MW per degree, 3.7% of its demand.

Figure 2 · Demand from 19:00 to 23:00 rises with heat in every regional control center; the Northeast adds the most MW and the Peninsular the most in proportion

Illustrative scenario: 2 °C more of maximum temperature, on days already above 26.5 °C, would raise 19:00–23:00 demand by about 1,540 MW, if the central slope held [E].  That order of magnitude fits within the reserve of the critical hours: 2,683 to 5,186 MW in 2025, and down to −1,558 MW in 2024. The 1,540 MW do not turn into capacity requirement. The requirement depends on which hours end up critical, on each supplier's load and on available supply.

3 · Available generation did not keep up with demand in those hours

From 2021 to 2024, average national-system demand in its critical hours rose 7,944 MW and available generation 344 MW [D].  The average reserve fell from 8,130 to 525 MW. In 2025, available generation rose 2,790 MW and the reserve returned to 4,280 MW. Each year averages a different set of 100 hours, so the comparison is descriptive: it does not identify why supply grew little.

Available generation is obtained by adding the reserve published by CENACE and demand in the same hour, as the Manual defines it [D].  Here demand is the one estimated from the energy balance. The Manual adds unserved demand and adjusts for demand response; those adjustments are not included. In hours with load shedding, the calculated available generation falls below the real one.

Figure 3 · From 2021 to 2024, demand in the critical hours nearly caught up with available generation; in 2025 the reserve recovered

Solar contribution is small in recent critical hours [D].  In 2025 it generated an average of 268 MW in those hours, 4.0% of its maximum on the same days. From 2021 to 2025, that share ranged from 2.7% to 6.9%. Observed solar generation contributed little to reserves during those hours. The analysis does not estimate how additional solar capacity would change reserves [D].

As a sensitivity exercise, heat would weigh more on demand than on supply [E].  Gas turbines and combined cycles lose capacity as air temperature rises. The technical literature gives −0.94% of capacity per °C for gas turbines; a calibration with operating data in California gives −0.21% for gas turbines and −0.165% for combined cycles. Applied to what those plants generated in the critical hours of 2025, those coefficients give 55 to 304 MW per °C. The upper end applies the gas-turbine coefficient to combined cycles as well. It is a sensitivity with external coefficients on dispatched generation, not a loss measured in the national system.

Plant-level availability is not public [V].  CENACE publishes it in its certified area. Without it, outages, maintenance and fuel shortages cannot be separated.

4 · The world is heading the same way

The International Energy Agency (IEA) projects that cooling will be 30% of global peak demand in 2035, in its stated policies scenario [V].  That same year it will be only 12% of electricity demand. Extreme heat adds 4% to peak demand and cuts available supply by 2%, measured against the median weather of 30 years [V]. Together they could erode one-third to one-half of typical reserve margins if planning does not account for them [V].

In emerging market and developing economies outside China, 85% of households are exposed to high temperatures and less than 20% of them have air conditioning [V].  The IEA projects that share will rise to 32% in 2035. These are global figures: the report has no cooling or peak figures for Mexico or the other 6 countries.

5 · Each country sets capacity with different hours

Among the mechanisms examined, Mexico stands out for using the lowest-reserve hours to determine its capacity requirement [V].  The other mechanisms identified use maximum demand, fixed hourly blocks or firm energy under critical hydrological conditions. Peru's rule was verified for 2021–2025. The Peruvian provision applicable from 2026 and the Dominican Republic's current rule remain subject to reconfirmation.

Country

What is paid or contracted

Hours that count

Mexico

Annual Capacity Requirement: capacity demanded in critical hours + planning reserve

The 100 lowest-reserve hours per capacity zone

Chile

Each customer's capacity withdrawal, scaled to the system peak

System: its 52 highest hours. Customer: its 52 maxima from 18:00 to 22:00, April to September

Colombia

Firm energy under the reliability charge

No hour: firm energy in critical hydrology

Guatemala

Each distributor covers with contracts its firm demand, its share of the system's projected maximum demand

The hour of projected maximum demand; generators' firm supply is measured in the peak band, from 18:00 to 22:00

Panama

Long-term capacity requirement: maximum generation demand minus contracted firm capacity

The period's maximum generation demand

Peru

Firm capacity at a regulated price

Peak hours from 17:00 to 23:00, set for 2021–2025

Dominican Republic · pending reconfirmation

Capacity on annual maximum demand

Annual maximum demand is measured within the system's peak hours; the rule that sets those hours was not reconfirmed

Sources: items 1, 10, 13 and 14. The rules for Mexico, Chile, Colombia, Guatemala and Panama were reconfirmed against primary regulations [V]. Peru's rule was verified for 2021–2025 [V]. The Peruvian provision applicable from 2026 and the Dominican Republic's current rule defining peak hours remain subject to reconfirmation.

Chile is the clearest contrast [V].  Its peak control period falls in winter, from April to September.

Colombia pays for something else, and its demand still follows heat [D].  The reliability charge pays for firm energy in critical hydrology, not for an hour. With the same controls as Mexico, demand from 19:00 to 23:00 rises 141–171 MW per °C, 1.7% of the average in those hours.

In Peru, maximum demand falls at night and in summer [D].  In 83 of 96 months from 2018 to 2025, it fell between 18:45 and 20:00. Each year's maximum fell between November and April in all 8 years. That summer heat, rather than year-end activity, explains it is a hypothesis [H].

Guatemala, Panama and the Dominican Republic keep their rule and no hourly series in this note.  Their operators publish operating reports; whether these allow an hourly 2018–2025 series remains to be checked.

6 · What the supplier decides and what the builder decides

The supplier decides how many MW to cover before knowing the year's weather [H].  The Contractual Requirement is committed in advance. The Annual Requirement is measured afterwards, in the 100 lowest-reserve hours. Coverage calculated using an average year may prove insufficient in a hotter year. Coverage calculated using the worst year may prove excessive [H].

100 MW valued at the 2025 reference net capacity price equal, arithmetically, MXN 440 million a year [D].  The national system's net capacity price was MXN 4.40 million per MW-year in 2025 [V]. The figure is not a saving, revenue or contractual cost. Each supplier's actual cost depends on its contracts, its settlement in the capacity market and its load in those hours.

At InsightIA we propose that the supplier calculate its requirement with temperature as an explicit variable.  The calculation has 3 parts: how much of its 19:00–23:00 load follows heat; how the system reserve splits between demand and available supply; and which resource covers those hours. That calculation is an S&OP Decision System for capacity coverage. It also serves Capital Projects: it shows which asset is worth building for those hours.

Whoever builds storage or firm generation decides which hours to design for [H].  Recent critical hours in the SIN are concentrated in the evening block from 19:00 to 23:00. A battery with 4 hours of effective duration could cover that block if it arrives charged and delivers its power in those hours. Whether it is credited as capacity depends on market rules. A solar plant alone contributes little in them. In Baja California, critical hours fall in the afternoon and the math is different.

7 · What would confirm or weaken this reading

  1. Would confirm: a per-degree slope that is steeper on the hottest days than on average. Would weaken: a slope that flattens above 32 °C

  2. Would confirm: that, in a model with temperature, availability, demand and calendar together, temperature explains part of the month of the critical hours. Would weaken: that its weight disappears once availability is included

  3. Would confirm: that a supplier's load in the critical hours follows temperature more than the national-system average. Would weaken: that its load is industrial and flat

  4. Would confirm: that available generation in the critical hours falls on the hottest days, once new plants are netted out. Would weaken: that it rises, as the critical-hour sample suggests

  5. Would confirm: an association between higher daytime solar generation and a shift in critical hours toward the evening and night, after accounting for temperature, changes in demand and the availability of other generation technologies. Would weaken: that this association disappears once those factors are included

8 · Questions for whoever supplies and whoever builds

If you supply energy

  • With what temperature and for which hour do you calculate today the capacity you must contract?

  • How much of your 19:00–23:00 load rises with each degree of heat?

  • Would your capacity coverage withstand a year like 2024, with the national system's reserve at −1,558 MW?

If you develop storage or firm generation

  • Does your asset deliver from 19:00 to 23:00, or in the afternoon, as Baja California requires?

  • With what temperature assumption do you value the capacity you will sell?

Evidence marks: [V] verified in the primary source · [D] derived, with the calculation shown · [E] estimate with stated assumptions · [H] hypothesis.

InsightIA analysis.

Sources

  1. Sener, Capacity Balance Market Manual (Manual del Mercado para el Balance de Potencia), DOF of September 22, 2016, numerals 1.3.31–1.3.33, 2.2.2, 3.3.1, 3.4.1 and 3.4.2 · https://www.diputados.gob.mx/LeyesBiblio/regla/n475.pdf

  2. CENACE, 100 Critical Hours, 2018–2025 · https://www.cenace.gob.mx/Paginas/SIM/MBPHorasCriticas.aspx

  3. CENACE, Executive Report of the 2026 Capacity Balance Market, production year 2025, and Net Capacity Price for 2025

  4. CENACE, Actual demand estimated from the energy balance, 2018–2025 · https://www.cenace.gob.mx/Paginas/SIM/Reportes/EstimacionDemandaReal.aspx

  5. CENACE, Energy generated by technology type, 2018–2025 · https://www.cenace.gob.mx/Paginas/SIM/Reportes/EnergiaGeneradaTipoTec.aspx

  6. Copernicus Climate Change Service, ERA5 reanalysis, 2 m temperature, via Open-Meteo, CC BY 4.0 license · https://open-meteo.com/en/docs/historical-weather-api

  7. IEA, World Energy Outlook 2026, CC BY 4.0 license, pp. 18, 22, 35, 66–67, 202–203 and 212

  8. California Public Utilities Commission (CPUC), Energy Division Staff Proposal for Derating Thermal Power Plants based on Ambient Temperature, R.21-10-002, January 20, 2023 · https://docs.cpuc.ca.gov/PublishedDocs/Efile/G000/M501/K282/501282461.PDF

  9. U.S. Energy Information Administration (EIA), FAQ 101 · https://www.eia.gov/tools/faqs/faq.php?id=101

  10. Coordinador Eléctrico Nacional, adequacy capacity calculation webinar, August 2026, slides 32–33; Chile's Ministry of Energy, Decree 4T/2026, numeral 3.3, and Decree 13T/2026

  11. XM, actual system demand, 2018–2025 · https://servapibi.xm.com.co/hourly

  12. COES, maximum demand in peak hours, 2018–2025 · https://www.coes.org.pe/Portal/medidores/MaximaDemanda/index

  13. CREG, Resolution 071 of 2006; CNEE, Wholesale Market Administrator Regulation, art. 87 · https://www.cnee.gob.gt/wordpress/wp-content/uploads/2023/nuevostemas/pdf/RAMM.pdf; AMM, Commercial Coordination Standard 2; CND, April 2025 training, Commercial Rules 5.1 and 5.5.2.1 · https://cnd.com.pa/images/doc/Presentaciones_Capacitacion_CND-GME_abril_2025.pdf

  14. Peru's Ministry of Energy and Mines, Ministerial Resolution 153-2021-MINEM/DM · https://busquedas.elperuano.pe/dispositivo/NL/1956880-1; Dominican Republic, General Electricity Law Regulation, Decree 749-02 · https://faolex.fao.org/docs/pdf/dom74631.pdf