Colombia raises what it pays its thermal plants and creates a new charge on demand
The Comisión de Regulación de Energía y Gas (CREG, the Energy and Gas Regulatory Commission), Colombia's electricity and gas regulator, issued Resolución CREG 101 139 de 2026 on November 20, 2026. It modifies and adds to Resolución CREG 101 127 de 2026, of August 27, which set the transitional measures for El Niño 2026–2027. Eighty-five days separate the 2 dates. The resolution takes effect upon publication in the Diario Oficial (official gazette). The CREG's regulatory repository records no such publication, so this cannot be confirmed.
The starting point is a thermal fleet that does not respond. Article 10 of Resolución 101 127 requires the Centro Nacional de Despacho (National Dispatch Center), Colombia's system operator, to schedule a minimum of thermal generation. The requirement runs for as long as the supply-risk period lasts. Boletín 362 of XM, the market administrator, calculated average thermal generation of 78.4 GWh per day over the previous 7 days, as of October 2, 2026. The curve's minimum was 100 GWh per day. The shortfall was 21.6 GWh per day, or 21.6% of the minimum. The partial reservoir level stood at 78.0%, 16.3 points below the 94.4% threshold, and the system condition was Alert.
The CREG opened its proposal to consultation in session 1505 on October 17 and received 27 submissions. The final resolution came 34 days later. Its recitals name 4 requests, and the operative articles answer all 4.
Who asked | What they asked, per the recitals | What the resolution provides |
ANDEG, thermal generators' association | Review the remuneration of thermal plants dispatched to meet the Article 10 minimum | Article 1: the positive reconciliation price adds 2 times the technology's operation and maintenance costs, plus the financial cost of fuel |
ANDEG | Study the recognition of real generation toward firm energy obligations | Article 2: real generation counts against the adjusted daily obligation, on days when the spot price exceeds the activation scarcity price |
Celsia, integrated generator | Adjust the cap on the declared value of spot gas contracts when gas call options are not exercised | Article 1: fuel supply and transport costs take the spot contract value when it exceeds the main contract's and the main contract is a gas call option |
Acolgen, generators' association | Modify the redispatch trigger of Article 13 | Article 3: a hydro plant whose reservoir exceeds the spill probability level loses its secondary frequency regulation assignment, not only one already spilling |
The fifth change answers none of those requests. Articles 4 to 6 rewrite Annex 7 of Resolución CREG 071 de 2006 and add its numeral 10.5. Demand takes on an hourly charge for the recognition of real generation. The charge is assigned to retailers in proportion to their national commercial demand and passed to the constraints component. That component travels in the end user's tariff.
Our reading: the resolution moves money toward thermal plants that generate and places the cost of the recognition on demand. The table above supports it, request by request. The charge that funds 1 of those changes was added by the commission. We cannot confirm whether any of the 27 consultation submissions asked for that charge. Their analysis lives in CREG Document 901 463 of 2026.
The same regulator has a second measure open on the same emergency. Proyecto de Resolución CREG 701 163 de 2026, of October 29, proposes 24-hour availability tests on the security rings that back firm energy obligations. Its consultation closed on November 13 with no final resolution published.
A Capital Allocation Decision System would value Colombian thermal generation with the 2 flows kept apart. One is the spot market's and the other the constraints component's, each with its own rule and its own payer. That is our hypothesis, and it falls if the resolution is not published in the Diario Oficial.
InsightIA analysis.